A Rowan company - serving Boca Raton, FL

Schluter Home Additions & ADU Nationwide

Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

Your dream remodel for as low as $199/month*on approved credit; ask for current terms
Styles & brands we work with

Kitchen remodeling
Kitchen remodeling
Bathroom remodeling
Bathroom remodeling
Home additions & ADU
Home additions & ADU
Roofing
Roofing
Windows & doors
Windows & doors
Driveway & pavers
Driveway & pavers
Fence
Fence

Before & after – our own jobs

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Schluter Home Additions & ADU: The Boca Raton Owner’s Guide

We stock and install Schluter waterproofing and tile-setting systems for home additions and ADU construction in Boca Raton, with typical installed pricing for Schluter-integrated additions running $45,000-$130,000 and ADU projects at $90,000-$220,000. Most Schluter membrane or drainage-component failures surface during the first heavy rain after an addition’s enclosure, when an improperly lapped Kerdi band or clogged KERDI-DRAIN weep hole sends water staining the new drywall below.

Call (754) 254-8065

Homeowners usually catch this after the tile setter leaves and the painter returns - a brown ring on the ceiling of the room they just expanded, or a musty smell in a new ADU bathroom that never fully dries. In Boca Raton’s subtropical climate, with 60-plus inches of annual rainfall and summer humidity that keeps concrete slabs sweating, Schluter’s membrane systems are specified precisely because they handle hydrostatic pressure better than traditional mud-bed methods. When they fail, it’s almost always an installation-sequence error, not the material itself.

Which Schluter Models This Applies To

Schluter doesn’t manufacture structural framing or room-addition kits - they make the waterproofing, uncoupling, and drainage layers that protect tile installations in wet areas of your new space. For Boca Raton home additions and ADUs, we most commonly specify and service four Schluter systems:

  • KERDI membrane and KERDI-BAND sealing strips - the orange polyethylene waterproofing layer behind shower walls and steam-room enclosures; critical in ADU bathrooms where space constraints force plumbing against exterior block walls.
  • DITRA uncoupling membrane - installed under floor tile to isolate substrate movement; essential on post-tension slabs common in Boca Raton’s 1980s-2000s housing stock, where slab curl can crack grout within two years.
  • KERDI-DRAIN and KERDI-LINE linear drains - the bonded flange drains that integrate with the membrane; we see the most callbacks on first-generation KERDI-DRAINs where the bonding flange was solvent-welded rather than bonded with unmodified thinset per Schluter’s current spec.
  • KERDI-BOARD building panels - waterproof substrate for tile in lieu of cement board; increasingly specified for ADU kitchen backsplashes where the owner wants a seamless transition from counter to cabinet.

Identifying your system is straightforward: KERDI membrane is bright orange and marked with “Schluter-KERDI” in 4-inch repeating print. KERDI-DRAIN flanges carry a date stamp and series code - Series 2 drains (post-2014) have a taller bonding flange and improved weep-hole geometry that resists the clogging we see in original Series 1 units on older Boca Raton renovations. We carry both OEM Schluter components and select aftermarket equivalents where the specification allows; for membrane work, we use Schluter material exclusively because the 10-year system warranty requires it. For drain grates and cleanout covers, we stock compatible brushed-nickel and oil-rubbed-bronze finishes from a secondary supplier at roughly 30% below Schluter list.

Rowan Construction Group Boca Raton is an independent contractor and is not affiliated with Schluter Systems.

Signs Your Schluter Home Additions & ADU Is Failing

Professional installing marble countertop during a kitchen remodeling project
Signs Your Schluter Home Additions & ADU Is Failing
  • Water stains on ceiling drywall below a new shower or wet room. The KERDI membrane has a breach at a seam, pipe penetration, or inside corner where KERDI-KERECK preformed corners were omitted or poorly bonded. In Boca Raton, we see this most often on second-story additions where the original roofer’s tie-in detail compromised the wall flashing sequence.
  • Grout cracking or tile tenting in a new bathroom floor. The DITRA membrane was either not fully embedded in thinset, or the substrate itself has excessive deflection - a structural issue, not a Schluter defect, but one the membrane cannot overcome. Post-tension slabs with unaddressed curl are the repeat offender in our market.
  • Standing water in shower pans that once drained properly. The KERDI-DRAIN weep holes are clogged with thinset debris from original installation, or the hair catcher was removed and never replaced, allowing debris to pack the sub-drain. Series 1 drains are particularly prone; the weep channels are narrower.
  • Soft or discolored KERDI-BOARD at counter-to-wall junctions. The board was cut too close to the sink deck without silicone sealant, or the plumber’s escutcheon plate was caulked instead of sealed with KERDI-FIX. In ADU kitchens where the owner chose an undermount sink, this junction sees constant splash exposure.
  • Efflorescence on exterior-facing tile in a new sunroom or lanai addition. The DITRA-DRAIN system (if specified) has a compromised drainage mat, or the weep screed at slab edge was omitted, trapping moisture in the mortar bed. Boca Raton’s driving rains from the southeast expose any flaw in exterior tile drainage.
BeforeBefore
AfterAfter

Replacement Cost & What’s Included

Scope Price Range What’s Included
Schluter membrane repair, localized (single shower, under 40 sq ft) $1,800-$4,500 Demo to studs, new KERDI membrane and banding, tile reset or replacement, 10-year Schluter system warranty
KERDI-DRAIN replacement (Series 1 to 2 upgrade) $650-$1,400 Drain extraction, flange bonding, new grate assembly, flood test, documentation
DITRA membrane replacement, standard bathroom floor $2,200-$5,000 Tile removal, substrate prep, new DITRA and tile, grout, 2-year workmanship warranty
Full Schluter system in new home addition $45,000-$130,000 Complete addition with Schluter wet-area specifications, permits, inspections, photo record, 365-Day Done Right Promise
ADU with full Schluter wet-area package $90,000-$220,000 Standalone unit, all Schluter membrane and drainage systems, impact-rated where required, signed change orders only

What drives the range: substrate condition (whether we need to grind a slab or sister joists for deflection), tile selection (porcelain reset vs. natural stone upgrade), and whether the failure is localized or systemic. Under Clause 1 of the Haven Standard, every price is written before work starts - no exceptions. The quote you receive is the flat price; if we find concealed damage during demo, we document it, write a change order, and nothing proceeds until you sign. That discipline is why our projects finish within a few percent of the agreed number across 4,000-plus jobs since 2007.

Every Schluter membrane installation we complete carries Schluter’s 10-year system warranty plus our 365-Day Done Right Promise: if it’s not done right, we make it right. The photo record - standard on every visit, not an upgrade - shows membrane lapping, flood-test results, and final condition.

DIY or Call Us?

Contractor applying mortar for kitchen backsplash tile installation
DIY or Call Us?

There is safe reconnaissance, and there is work that requires a crew.

What you can check: verify your KERDI-DRAIN grate lifts out for cleaning (most do, with a flathead screwdriver or the supplied puller); confirm the hair catcher is present; and run a five-minute flood test by plugging the drain and filling the pan to the curb height. If water drops more than 1/16 inch in 15 minutes, you have a breach. Photograph any stains and note whether they appear after rain or after shower use - this tells us whether the failure is in the membrane or the plumbing.

What you should not attempt: membrane repair or replacement. KERDI installation requires a flood-tested substrate, unmodified thinset mixed to exact consistency, and 2-inch minimum overlaps at all seams - inspected and documented before tile covers it. Once tile is set, the only correction is demolition. In Boca Raton’s humidity, an open membrane left overnight can trap condensation at the substrate, creating a new problem. And any work on second-story additions involves fall protection and structural load evaluation we don’t recommend handling without proper equipment.

Measure twice, document everything, then build. Call (754) 254-8065 to schedule your free estimate. We’ll review your Schluter system, identify the series and condition, and give you a written price before anyone picks up a tool.

Get the price in writing before anything starts.A real person answers, day or night.
Call now

FAQs

Need Construction help in Boca Raton? Licensed & insured · Free in-home estimates response · free estimates
Call (754) 254-8065
Local Service Coverage

Request a Free Estimate in Boca Raton

Tell us what you need - Rowan Construction Group Boca Raton responds fast. No obligation.

By reaching out through this form, you acknowledge our Privacy Policy and consent to receive communications via phone, email, or SMS about your service request, including from the local pros who may handle it.

Prefer to text? Text Us
Call Now - Fast Dispatch