Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Sterling Home Additions & ADU: The Boca Raton Owner’s Guide
We stock and install Sterling-compatible components for home additions and ADU projects in Boca Raton, with typical installed pricing from $45,000 to $130,000 for full additions and $90,000 to $220,000 for detached ADUs. Most Sterling part replacements and system upgrades can be assessed within 48 hours, and we carry common Sterling hardware and connection systems on our trucks. Homeowners usually discover an issue when a Sterling window unit won’t seal properly against the addition’s frame, when a sliding door track in the ADU starts binding after a humid Boca Raton summer, or when the integrated flashing system shows separation at the roof-wall intersection after a storm.
Which Sterling Models This Applies To
Sterling produces several product lines relevant to home additions and ADUs, and matching the right component matters more than most homeowners realize. The Sterling Ensemble and Accord series shower surrounds appear frequently in Boca Raton ADU wet rooms because the 60-inch and 32-inch base widths match the compact footprints common in local garage conversions and backyard units. The Kohler-owned Sterling brand also manufactures VistaPivot and Finesse door systems used in addition bathrooms, with track hardware that differs by door weight rating, 55-pound versus 75-pound capacity. We also see Sterling utility sinks and laundry cabinets in ADU kitchenettes, particularly the Latitude and Advantage series with 25-inch and 33-inch basin widths.
To identify your exact Sterling model, check the stamped label inside cabinet door frames, on the underside of sink basins, or on the edge of shower base thresholds. The four-digit SKU prefix tells us the series and production year, which determines whether your hardware matches current inventory or requires a cross-reference to updated part numbers. For shower door systems, measure the track width at the top of the frame, 36-inch and 48-inch being the most common in South Florida ADU builds from 2015 to 2023. We source both OEM Sterling hardware and quality equivalents from our vetted supplier network, fifty-plus brands including KraftMaid, Cambria, and Silestone, and we’ll document which route we recommend and why in your written quote.
Rowan Construction Group Boca Raton is an independent service provider, not affiliated with Sterling or Kohler.
Signs Your Sterling Home Additions & ADU Is Failing

- Shower door track grinding or catching. The Sterling VistaPivot uses a nylon roller assembly that degrades in Boca Raton’s salt-air environment, particularly in ADUs within a mile of the Intracoastal. The roller housing cracks, the axle shifts, and the door drops enough to scrape the threshold.
- Shower surround panels separating at corners. Sterling Ensemble units rely on a tongue-and-groove seam with factory-applied adhesive. In unconditioned ADUs, thermal cycling between 85-degree days and 65-degree nights weakens the bond, creating gaps that allow water behind the panel.
- Sink cabinet toe-kick swelling or delamination. Sterling Advantage cabinets use a composite toe-kick that wicks moisture from concrete slabs common in Boca Raton garage conversions. The material expands, the finish bubbles, and the structural integrity of the base frame degrades.
- Sliding door weatherstrip hardening or tearing. The bulb seal on Sterling Finesse systems loses pliability after three to four years of UV exposure in south-facing additions. Gaps appear at the jamb, and conditioned air leaks into the wall cavity.
- Window unit condensation between panes or frame sweating. Sterling integrated windows in addition systems rely on a specific flashing overlap with the wall sheathing. When the butyl tape degrades, humid exterior air reaches the cool frame surface and condenses, staining drywall and promoting mold.
Before
AfterReplacement Cost & What’s Included
Full Sterling system replacement in a Boca Raton home addition or ADU runs $45,000 to $130,000 for additions and $90,000 to $220,000 for detached ADUs, with component-level repairs starting lower depending on scope. A Sterling shower door roller and track rebuild typically falls between $800 and $2,500 installed. Cabinet toe-kick and base frame repair runs $400 to $1,200. Window flashing and seal replacement in an integrated Sterling system ranges from $1,500 to $4,500, depending on whether the wall sheathing behind the unit has taken moisture.
What drives the range: accessibility to the component, whether surrounding finishes must be disturbed, and whether the failure has caused secondary damage to framing or drywall. Every quote we deliver is flat-priced with a written scope, parts specified by brand and SKU, and labor itemized by phase. Under Clause 1 of The Haven Standard, that written price is delivered before any work starts. Our 365-Day Done Right Promise covers the installation, and we provide a documented photo record of the condition we found and the completed repair as standard, not an upgrade.
DIY or Call Us?

Some Sterling component checks are safe for a homeowner. Verify that door rollers sit properly in the track groove, inspect weatherstrip for visible cracking, and confirm that sink cabinet bases show no soft spots when pressed with a screwdriver handle. These observations help us understand the issue before we arrive.
Where DIY goes wrong: Sterling shower surround seams require specific adhesive and clamping pressure to re-bond properly, and improper reinstallation voids any remaining warranty coverage. Window flashing repair involves removing siding or stucco, assessing sheathing moisture content, and reintegrating the weather barrier, work that affects the building envelope and can lead to concealed mold or structural rot if done incompletely. The door and window systems in Sterling additions also carry weight ratings that must be matched exactly, aftermarket hardware that fits the track but underrates the door mass will fail within months. For anything involving the building envelope or load-bearing hardware, we recommend a professional assessment. Call (754) 254-8065 to schedule yours, estimates are free.
FAQs
Sterling shower door rollers and tracks typically last five to seven years within a mile of the coast, and eight to twelve years farther inland, with UV and salt air being the primary accelerants. Cabinet components in air-conditioned additions match national lifespan expectations, ten to fifteen years, but in unconditioned ADUs with humidity above 60 percent, toe-kick and base materials may degrade in half that time. Call (754) 254-8065 for an exact assessment of your installation, estimates are free.
Roller assemblies, weatherstrip, and sealant beads can often be repaired or refreshed if caught before secondary damage occurs. Panel separation in shower surrounds and cabinet base delamination usually require replacement of the affected unit, as the substrate material does not restore to specification once moisture-compromised. We evaluate this during our initial assessment and document our recommendation with photos. Call (754) 254-8065 to schedule, estimates are free.
Single-component replacements, a shower door roller rebuild or weatherstrip replacement, typically take two to four hours. Full surround or cabinet base replacement in an occupied ADU requires one to two days, including cure time for adhesives and sealants. We schedule by phase, each signed off before the next begins, so you know exactly when the space will be usable again. Call (754) 254-8065 to book a slot, estimates are free.
We carry common Sterling rollers, tracks, weatherstrip profiles, and sealant systems on our Boca Raton trucks, and our warehouse stocks the full current catalog for next-day availability on less common items. For discontinued Sterling SKUs, we cross-reference to quality equivalents from our fifty-plus vetted brands and document the substitution in your written quote for approval. Call (754) 254-8065 to confirm availability for your specific model, estimates are free.
Ready to get your Sterling addition or ADU back to specification? Call (754) 254-8065 to schedule your free estimate. We’ll deliver a written price with line-item parts and labor before any work starts, under Clause 1 of The Haven Standard, and every visit includes a documented photo record as standard. Grant Rowan and our crew have handled Sterling systems across Boca Raton, from Mizner Park tenant improvements to coastal ADU conversions, and we bring the same discipline to every job: measure twice, document everything, then build.
Written by Grant Rowan, Owner, Rowan Construction Group Boca Raton at Rowan Construction Group Boca Raton, serving Boca Raton and nearby areas.







Before
After
Before
After
Before
After