Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Cabinets & Countertops in Boca Raton, FL
Cabinet and countertop replacement in Boca Raton typically runs $8,500-$32,000 depending on cabinet line, countertop material, and kitchen size - and Rowan Construction Group puts that number in writing, with a full scope, before anyone touches a single hinge. If you’re weighing your options, call (754) 254-8065 and we’ll walk you through a flat written quote at no charge.
This page covers what drives cost in South Florida kitchens specifically, what our process looks like from first measurement to final cleanup, and what questions you should be asking any contractor before you sign anything. Cabinet and countertop work sits at the center of our Kitchen Remodeling in Boca Raton service, and it’s where Grant Rowan has seen more projects go sideways – and more clients saved from that – than any other single scope in a kitchen gut.
Boca Raton’s housing stock presents specific conditions that affect cabinet installations: older Camino Gardens and Royal Palm Yacht & Country Club homes often have soffits built over original 1970s upper cabinets, and the humidity patterns here – elevated from June through October – mean that certain plywood substrates will delaminate in under five years if the wrong product goes in. We name those products by brand. We describe what we find in your kitchen before we quote it. That’s not a selling point; it’s how accurate pricing works.
Under Clause 1 of the Haven Standard, the written price is delivered before any work starts. Every time, on every trade. No change proceeds without a signed change order – that discipline is why Rowan’s projects finish within a few percent of the agreed number, across 4,000-plus jobs since 2007.
When You Need Cabinets & Countertops
- Box failure on existing cabinets. The frames are separating from the wall, drawer boxes have dropped, or face frames are pulling away from the carcass. In Boca Raton’s coastal humidity, particleboard-core cabinets from the 1990s and early 2000s can delaminate from the inside out – the exterior looks fine until a drawer pull comes off in your hand. This is structural, not cosmetic, and refacing won’t fix it.
- Countertop cracking or staining that cleaning won’t solve. Laminate surfaces that have swelled at seams, natural stone that was installed without a proper sealer and has absorbed grease or citric acid, or tile grout that’s been regrouted twice and is now compromised at the substrate level. If the damage is below the surface, resurfacing adds cost without solving the problem.
- A layout that no longer works. The kitchen was designed for a different household, a different cooking style, or a different era of appliances. In Boca’s move-up market, buyers picking up homes in Broken Sound or Woodfield Country Club routinely inherit kitchens that are technically functional but poorly organized for how they actually cook. New cabinet layout changes that.
- Pre-sale preparation in a price-sensitive market. Boca Raton’s median home price has kept sellers motivated to present well. A dated kitchen with original 1988 oak cabinets and cultured marble counters can be the single detail that gives a buyer leverage on price. A targeted cabinet and countertop replacement – not a full gut – often returns more than it costs when priced and scoped correctly.
- Post-water-damage rebuild. A refrigerator line leak, a dishwasher pan failure, or a slow supply line drip under the sink can saturate the toe kick area and travel into the base cabinet boxes before anyone notices. If the insurance adjuster has signed off and you need a replacement scope with documentation for the carrier, Rowan’s photo record on every visit is already built for that purpose.
- Appliance upgrade requiring cabinet modification. Moving from a 30-inch range to a 36-inch or adding a panel-ready refrigerator often means cutting into existing cabinet runs or rebuilding end panels. If the modification isn’t done cleanly, it’s visible – and in higher-end Boca kitchens, visible seams at a $12,000 refrigerator are not acceptable.
Our Cabinets & Countertops Process

- In-home measurement and condition assessment. Before any number is written, we measure the kitchen twice and document what we find – substrate condition behind existing cabinets, soffit configuration, wall plumb and level deviations (older Boca homes, particularly those built before 1985, often have wall conditions that affect cabinet installation tolerances), and the current rough plumbing and electrical positions relative to the proposed layout. You receive a photo record of that assessment as a standard deliverable, not an add-on.
- Written flat-price quote with full scope. Under Clause 1 of the Haven Standard, the quote you receive is a flat price with a written scope – cabinet line, door style, box construction (plywood versus MDF core, clearly stated), countertop material and edge profile, hardware allowance, and any demo or disposal costs included. Nothing is buried. If we anticipate a condition that might change scope – say, a soffit that may conceal original plumbing – we write that contingency into the quote before you sign it, not after we open the wall.
- Material selection and lead-time confirmation. We work with KraftMaid and Wellborn on the cabinet side, which covers most of the finish and construction specifications Boca homeowners ask for: full-overlay and inset door styles, plywood box construction, and finish warranties that hold up in South Florida’s humidity range. On countertops, Cambria and Caesarstone are our primary engineered quartz lines; for natural stone, we source slabs and have you approve the actual slab – not a sample chip – before fabrication. Lead times are confirmed in writing before demo begins.
- Demo, substrate preparation, and rough-in confirmation. Demo is done by uniformed, background-checked crew. After the existing cabinets are removed, we assess the wall condition and level plane before any new box goes up. If we find rot, mold, or a substrate issue that was not visible at the initial assessment, work stops, you get a photo record of what was found, and no repair proceeds without a signed change order. This is the administrative discipline that keeps final costs within a few percent of what you agreed to.
- Cabinet installation, countertop templating, and fabrication. Upper cabinets are installed first and shimmed to level regardless of wall condition – the boxes don’t conform to the wall, the wall is corrected behind the boxes. Base cabinets are leveled and secured at the studs, not just the drywall. After base installation, a countertop template is cut from the actual installed cabinets (not from the drawing) and sent to fabrication. Engineered quartz typically has an 8-12 day fabrication lead; natural stone varies by slab availability.
- Countertop installation, hardware, punch list, and photo close-out. Countertops are set and sealed. Hardware is installed per the agreed spec. We walk the punch list with you before the crew leaves – door alignment, drawer adjustments, any finish touchups – and the close-out photo record is delivered to you that day. The 365-Day Done Right Promise starts from that date: if it’s not done right, we make it right.
Before
AfterCabinets & Countertops Pricing in Boca Raton
Cabinet and countertop pricing in Boca Raton varies more than most homeowners expect before they start getting quotes. The range is real: a focused base and upper cabinet replacement with engineered quartz in a 150-square-foot kitchen runs differently than a Full Kitchen Remodeling project with natural stone in a 300-square-foot open-plan. Here’s how the numbers break down by component so you can build a realistic picture before the estimate conversation.
| Scope Component | Typical Boca Raton Range | Notes |
|---|---|---|
| Semi-custom cabinets (KraftMaid, Wellborn) – supply and install | $5,500 - $16,000 | Plywood box construction, full-overlay doors; range reflects kitchen size and door style |
| Engineered quartz countertops (Cambria, Caesarstone) – supply and install | $3,200 - $8,500 | Per linear foot pricing averages $95-$145 installed; edge profile and cutouts affect total |
| Natural stone countertops (granite, quartzite, marble) – supply and install | $4,000 - $11,000+ | Slab variability is the primary driver; exotic quartzites can exceed this range |
| Demo and disposal (existing cabinets and counters) | $600 - $1,800 | Tile backsplash demo adds cost if included; disposal fees reflect current Boca Raton haul-out rates |
| Hardware (pulls, hinges, soft-close) – allowance | $350 - $1,200 | Allowance is written into the quote; overages require a signed change order |
| Full kitchen cabinet + countertop replacement (combined, typical range) | $8,500 - $32,000 | Most Boca Raton projects land between $12,000 and $22,000 for a mid-size kitchen |
Several factors push Boca Raton projects toward the higher end of these ranges. Kitchens with soffits require additional framing or soffit removal work. Homes in the coastal zone sometimes have wall conditions – moisture intrusion behind existing cabinets, for example – that add substrate repair scope. And open-plan kitchens with Kitchen Island Installation typically require more linear footage of countertop and more cabinet boxes than a galley layout of similar square footage suggests.
The quote you receive from Rowan is a flat written price that includes all of the above as line items. If something changes during demo – a condition we couldn’t see before the walls were opened – we stop, document it, and bring you a written change order with a number attached before work continues. That is not a negotiating tactic; it is the process that has kept Rowan’s project costs within a few percent of the agreed price across more than 4,000 jobs.
Call (754) 254-8065 to schedule your written estimate. If you already have a quote from another contractor, bring it: Rowan offers a free second opinion on any written estimate, reviewed line by line at no charge.
FAQs – Cabinets & Countertops in Boca Raton

How long does a cabinet and countertop replacement take in Boca Raton?
Most cabinet and countertop replacements in Boca Raton run 10-18 business days from demo to countertop installation, with the largest variable being countertop fabrication lead time. Engineered quartz (Cambria, Caesarstone) typically takes 8-12 business days from template to installation; natural stone can run longer depending on slab availability at the fabricator. Cabinet delivery lead times for KraftMaid and Wellborn semi-custom lines are currently running 3-5 weeks, which means the timeline is confirmed in writing before demo starts – not estimated after the old cabinets are already out. Call (754) 254-8065 for a current lead-time check before you plan around a specific date.
Is refacing my existing cabinets a better value than replacing them?
Refacing is worth considering when the existing cabinet boxes are structurally sound – plywood construction, no delamination, no moisture damage, and doors and drawers that operate correctly. If those conditions are met, refacing can cost 40-60% less than full replacement. In Boca Raton, however, a significant share of kitchens built before 2000 used particleboard-core boxes that have absorbed enough humidity over 20-plus years to make refacing a short-term fix on a compromised substrate. We assess box condition during the initial visit and give you a written answer either way. If refacing is the right call for your kitchen, we’ll tell you that before you spend money on replacement you don’t need.
What countertop material holds up best in South Florida’s climate?
Engineered quartz – Cambria and Caesarstone are the two lines we spec most often – is the most consistent performer in South Florida kitchens because it’s non-porous, doesn’t require periodic sealing, and doesn’t react to the humidity swings between a well-air-conditioned kitchen and an August afternoon when the back door has been open. Natural stone (granite, quartzite, marble) performs well when installed and sealed correctly, but marble in particular is vulnerable to the citric acid in South Florida cooking and the salt air in coastal Boca homes. Quartzite is harder and more resistant than marble but still requires sealing maintenance. The right answer depends on how you cook and how much maintenance you’re willing to track – we walk through that conversation during the estimate, with material samples, not just photos.
Does Rowan handle the permit process for cabinet and countertop work in Boca Raton?
In most cases, a straight cabinet and countertop replacement – no plumbing relocation, no electrical panel work, no structural modification – does not require a building permit in Boca Raton under current Palm Beach County code. If your project does include moving a sink drain, relocating an outlet, or removing a load-bearing soffit, those components require permits and we pull them. The determination is made during the assessment visit and documented in the written scope before any work starts. You’re never in a position where permit costs appear after you’ve signed. Call (754) 254-8065 with your project details and we can usually tell you in the first conversation whether permits are likely to be required.
Why Rowan Construction Group for Cabinets & Countertops in Boca Raton
Grant Rowan started Rowan Construction Group in 2007 with a straightforward operating premise: write the price before the work starts, document what the crew finds and does, and don’t let a change order get signed after the fact. Across 4,000-plus projects – including several hundred our Kitchen Remodeling services in Boca Raton and the surrounding communities of Delray Beach, Boynton Beach, and Deerfield Beach – that premise has held. Projects finish within a few percent of what the customer agreed to because the paperwork discipline is real, not aspirational.
The 365-Day Done Right Promise is printed on every page and backed by the Haven Standard’s written terms. If the work isn’t right within a year of completion, Rowan makes it right. That’s not a general statement of intention; it’s a documented commitment with a terms page you can read before you sign the contract.
Cabinet and countertop work is the part of a Kitchen Design & Layout that the homeowner touches every single day. It’s worth getting the box construction specified in writing (plywood, not particleboard, and stated as such in the quote). It’s worth confirming the countertop fabrication lead time before demo starts. And it’s worth having a contractor whose crews are background-checked, uniformed, and leave a photo record of every visit – not because it sounds professional, but because it’s what you’d want if you ever needed to reference what was found behind your walls.
For a broader look at what a full kitchen project involves, the home page outlines all seven trades we cover. And if you’re still defining the scope – whether cabinets and countertops alone makes sense versus a more involved remodel – the starting point is a written estimate that lays out both options with real numbers.
Call (754) 254-8065 to schedule your free written estimate. Bring a competitor’s quote if you have one – we’ll review it line by line at no charge, and you’ll leave with a clearer picture of what you’re actually comparing.
Written by Grant Rowan, Owner at Rowan Construction Group Boca Raton, serving Boca Raton since 2007.







Before
After
Before
After
Before
After